Risk assessment
Before filming we have to establish an dangers that we may encounter while filming and make sure we have quick affective solutions to deal with an problems which may a rise. I personally went on the fill out our risk assessment grid which is pasted below.
HAZARD
|
RISK
|
WHO IS AT
RISK
|
CONTROL
MEASURES
|
COMMENTS
/ACTIONS
|
RISK RATING
1 HIGH
2 MEDIUM
3 LOW
|
TICK IF ALL
IN PLACE
|
Lights
|
Very bright
Get very hot
Wires
|
Actors
|
· Try not to look at the
lights to avoid any damage to the eyes
· Take breaks and drink
water due to heat
· Be carful where you are
walking
|
|
3
|
ü
|
Green screen
|
May trip on the fabric
|
Actors
|
·
Move carefully when using the green screen to avoid tripping
on the fabric
|
|
3
|
ü
|
Asthma
|
Group member having asthma
|
Actor
|
·
Make sure they carry their inhaler with them at all times
during filming.
|
|
2
|
ü
|
No comments:
Post a Comment